Overview
La Negra is a long-standing underground polymetallic silver mine located in Querétaro State, central Mexico, approximately 150 kilometres by paved road from the city of Querétaro. The mine is situated within the Sierra Gorda silver belt and is supported by established underground workings, grid power and a processing plant with a nameplate capacity of approximately 2,500 tonnes per day.
Mining commenced in 1971 and continued through several ownership and commodity cycles before operations were restarted by a private Mexican company in 2024. Between 1971 and the end of 2020, La Negra processed approximately 14.6 million tonnes at average grades of 107 g/t silver, 0.59% lead, 1.95% zinc and 0.66% copper.
The underground operation uses a combination of long-hole stoping and room-and- pillar mining methods. Ore is treated through crushing, grinding, flotation and filtration circuits to produce lead-silver, copper-silver and zinc concentrates, with the majority of silver reporting to the lead and copper products.
Silverco completed its acquisition of La Negra in May 2026 and is undertaking debottlenecking initiatives that aim to lift production to nameplate in H1 2027.

In September 2026, Silverco published an updated Mineral Resource Estimate and Preliminary Economic Assessment, outlining an 8.2-year mine life and average annual production of approximately 4.1 million silver-equivalent ounces, with steady- state throughput of 2,500 tonnes per day anticipated from H2 2027. The PEA estimates approximately 65% of life-of-mine revenue will be attributable to silver.
A 15,000-metre surface and underground exploration programme is also underway, representing the first large-scale exploration campaign at La Negra in approximately two decades. The programme is targeting near-mine extensions and higher-grade mineralisation, with potential to expand the existing resource base and extend mine life.
References
Silverco Mining Ltd., Technical Report on the La Negra Ag-Au-Pb-Zn Mine, Querétaro, Mexico, dated May 5, 2026, with an effective date of March 25, 2026.
Silverco Mining Ltd. News Release titled “Silverco Mining Provides La Negra Mine Operations Update,” dated August 24, 2026.